ToR
TERMS OF REFERENCE (ToR)
Consultancy for Development of Bilingual Training Manuals and Delivery of Community Trainings
| Project Title | Enhancing Climate Resilience and Sustainable Ecosystems |
| Implementing Organization | Environmental Protection Society (EPS), in partnership with the International Rescue Committee (IRC) |
| Funding Agency | The International Union for Conservation of Nature (IUCN) – Global EbA Fund |
| Assignment | Development of Three Bilingual Training Manuals and Delivery of Community-Level Trainings |
- Background
Environmental Protection Society (EPS), in partnership with the International Rescue Committee (IRC), is implementing the ‘Enhancing Climate Resilience and Sustainable Ecosystems’ project with funding from IUCN under the Global EbA Fund.
The project seeks to strengthen the resilience of vulnerable communities through Ecosystem-based Adaptation (EbA), climate-smart agriculture, sustainable natural resource management, green skills and climate-resilient livelihood opportunities in District Swat & Buner, Khyber Pakhtunkhwa.
The project has completed a rapid market scan and a value chain analysis for the target districts, both of which will be shared at the inception meeting. The consultant shall ensure that crop, product, technology, and enterprise choices presented in the manuals are consistent with the demand, price, buyer, and constraint data contained in those studies, and shall justify in writing any departure from their findings.
The intended participants include farmers, women, youth, and community members, including people with low levels of formal education across the target union councils of Swat & Buner.
The training materials must be simple, practical, visual, and participatory. While the written materials require English and Urdu, comprehension in the training room will depend on Pashto. All training must be facilitated in Pashto, and key messages, Do’s and Don’ts, and pictorial job-aids must carry Pashto captions.
- Purpose and Objectives
The purpose of the assignment is to develop and deliver practical training that enables targeted communities to adopt climate-resilient, environmentally sustainable, and economically viable agricultural and livelihood practices.
The specific objectives are to:
- Develop three practical and bilingual English-Urdu training manuals.
- Strengthen knowledge and practical skills in climate change adaptation, green skills, climate-smart agriculture, nursery and horticulture, organic farming, composting, kitchen gardening, and food processing.
- Promote sustainable and ecosystem-friendly agricultural practices and technologies.
- Support livelihood diversification, agricultural value addition and small-scale enterprise development.
- Develop context-specific climate-smart agriculture content for Buner and Swat.
- Deliver 12 practical community-level training events using participatory and hands-on approaches based on the developed training manuals. The project will deliver twelve (12) structured training sessions targeting farmers, male and female youth. These will include four (4) trainings on Climate-Smart Agriculture (two for men and two for women) four (4) trainings for female youth on kitchen gardening and value-added food processing techniques, including ketchup, pickle, and jam production; and four (4) trainings for male youth on climate change adaptation and green skills, focusing on nursery raising, horticulture, and orchard management. The trainings are designed to improve climate resilience, enhance livelihood prospects, and promote sustainable and environmentally responsible economic activities among project clients.
- Assignment Packages
Reporting Line, Oversight and Technical Review
The consultant/consultancy firm shall report to the designated Focal Point for the assignment i.e. the Program Manager EPS, who will serve as the primary coordination contact and facilitate communication with relevant project staff and stakeholders.
The Focal Point will oversee the assignment, coordinate the review and validation process, and provide consolidated comments on draft manuals, training plans, assessment tools and reports. Technical review may involve relevant EPS/IRC technical staff and other designated subject-matter reviewers, as appropriate.
The consultant/firm shall provide brief progress updates to the Focal Point at agreed milestones, including after completion of the inception/work-planning stage, submission of the first draft manual(s), completion of technical review/validation, and completion of assigned training events. Any emerging risks, delays or issues requiring management attention shall be communicated promptly.
The final reporting and approval arrangements, including the name/designation of the EPS Focal Point and any additional technical reviewers, shall be confirmed at the inception meeting.
The assignment comprises three complementary packages.
An individual consultant or consultancy firm may apply for one package, multiple packages, or all three packages, provided that the applicant demonstrates the required qualifications, experience and technical capacity for the package(s) applied for.
Applicants applying for multiple packages shall clearly demonstrate their capacity to deliver each package and shall propose appropriate technical resource persons and their engagement approach.
EPS reserves the right to:
- Award one package to one consultant/firm;
- Award multiple packages to the same consultant/firm; or
- Award different packages to different consultants/firms.
Each package will be evaluated against its specific technical requirements. The manual should be developed in reference to aligned FAO Climate-Smart Agriculture Sourcebook; IUCN Global Standard for Nature-based Solutions; FEBA/IUCN EbA qualification criteria; principles and good practices, while adapting the content to local farming conditions and the needs of smallholder farmers.
PACKAGE 1
Climate Change, Green Skills, Nursery, Horticulture and Orchard Management
Training duration: 03
Expected training events: 4 (2 Male Swat, 2 Male Buner) Total Participants (15-20 Participants per Training
Module 1: Climate Change Basics, Impacts and Adaptation
- Weather, climate and climate variability.
- Causes and impacts of climate change.
- Climate risks to agriculture and livelihoods.
- Climate change adaptation and resilience.
- Ecosystem-based Adaptation (EbA).
- Farm and community-level adaptation measures.
Module 2: Green Skills and Basic Climate-Smart Agriculture
- Green skills and green livelihood opportunities.
- Focus on specific green enterprises validated by the market scan (e.g., certified nursery operations, composting/vermicomposting for sale, input retail). Include indicative start-up costs, named buyer types, and indicative margins.
- Principles of basic Climate-Smart Agriculture (CSA), soil/water conservation, and integrated nutrient/pest management.
Module 3: Nursery Raising and Management (Practical focused)
- Nursery layout, infrastructure, cost per plant, break-even volume, and seasonal cash flow.
- Registration and certification with the KP Agriculture and Forest Departments.
- Supplying afforestation programs, NGOs, and orchard growers.
- Propagation techniques (grafting, budding, cutting, layering) prioritizing varieties and rootstocks identified in the value chain analysis.
Module 4: Horticulture and Crop Production
- Horticultural crop selection for local conditions.
- Crop selection based on agronomic suitability and market acceptance (ranked using scan data).
- Land preparation, organic nutrient management, and water management.
- Forming village-level orchard service teams: providing grafting and pruning as a paid seasonal service.
Module 5: Integrated Pest and Disease Management
- Identification of common pests and diseases in field and nursery.
- Economic threshold level (ETL) concept.
- Cultural, mechanical and biological control methods.
- Preparation of homemade botanical formulations (Neem, etc.).
- Use of herbs and plant extracts in IPM.
- Safe use of agricultural inputs and pesticides.
Module 6: Harvesting, Post-Harvest Management and Value Addition
- Targeting specific loss points identified in the value chain analysis.
- Exercise calculating the share of the final consumer price captured at each node.
- Market session built on scan data: buyer types, quality specs, seasonal price calendars, grading effects, how the arhti (commission agent) system works, and actual buyer specifications in Mingora, Peshawar, and Islamabad. Invite a local buyer/commission agent to the session.
PACKAGE 2
Kitchen Gardening, Ketchup, Pickle and Jam Making, Business and Action Planning
Training duration: 03 days
Expected training events: 4 (Female targeted) Total Participants (15-20 Participants per Training)
The manual will combine kitchen gardening, household nutrition, agricultural value addition and food processing, with emphasis on practical livelihood and small-enterprise opportunities.
Module 1: Kitchen Gardening, Foundation & Business Planning (Theory + Planning)
- Introduction to the 4‑day programme and expected outcomes.
- Kitchen Gardening Essentials:
- Importance and benefits of kitchen gardening.
- Site selection and garden layout.
- Choosing seasonal vegetables and herbs suited to the local area.
- Seed selection, treatment, and seedling preparation.
- Bed preparation, planting, crop spacing, and succession planting.
- Water‑efficient gardening and mulching.
- Composting and use of organic inputs.
- Organic pest and disease management.
- Rooftop gardening and basic care.
- Harvesting for household nutrition.
- Create a 6‑month seasonal kitchen garden calendar.
- Track A (Household Nutrition): Focused on food-insecure/remote households; dietary diversity, multi-cropping.
- Track B (Surplus/Market): Focused on households near roads/markets; low-tunnel off-season vegetables, bed-size-to-income calculations, seed saving, and surplus sale.
- Food Safety & Hygiene:
- Agricultural value addition – what it means.
- Numeric control points: required acidity (pH ≤ 4.2), soluble solids (Brix 65-68), jar sterilization, hot-fill/water-bath processing, and permitted preservative levels.
- Personal hygiene and workplace cleanliness.
- Preventing food contamination.
- Cleaning and sanitation of equipment and utensils.
- Safe handling, storage, and packaging.
- Introduction to Business Planning:
- Market assessment and identifying potential customers.
- Choosing which products to make (ketchup, pickle, jam).
- Sourcing raw materials and estimating equipment needs.
- Calculating production costs, pricing, and profit.
- Basic break‑even analysis.
- Branding, packaging, and local sales channels.
- Record keeping and managing business risks.
- Built entirely on the rapid market scan: named buyer categories, actual local price ranges, seasonality, and top product constraints.
- Pre-populated costing templates utilizing actual input, jar, label, and retail prices from the market scan.
- Draft your personal business plan:
- Decide on your product and target market.
- List required investment and equipment.
- Outline raw material sources.
- Estimate your production costs and selling price.
- Identify possible risks and how to reduce them.
- Write down immediate next steps.
Module 2: Practical Production (Ketchup & Pickle Practical)
- Ketchup Making:
- Select and prepare raw materials.
- Pulp and process the ingredients.
- Mix formulation and cook to correct consistency.
- Perform quality checks (taste, texture, colour).
- Bottle, seal, and label the finished product.
- Discuss storage and shelf‑life.
- Troubleshoot common problems (e.g., thinning, separation).
- Pickle Making:
- Understand different types of pickles.
- Prepare raw vegetables/fruits.
- Balance salt, oil, and acidity correctly.
- Add spices according to formulation.
- Process and set aside for maturation.
- Package and label the pickle jars.
- Check quality and storage requirements.
- Troubleshoot common issues (e.g., spoilage, softness).
- Integrated Business Activity (during production):
- Calculate the real cost per bottle/jar based on ingredients and time used.
- Review the break‑even point and adjust pricing if needed.
- Update your business action plan:
- Refine your production plan and timeline.
- Add the actual cost and profit figures from today’s practice.
- Note any risks observed during production and how to avoid them.
Module 3: Practical Production (Jam) & Business Finalization (Hands‑on + final planning)
- Jam Making:
- Select and prepare fresh fruit.
- Pulp the fruit and measure sugar, pectin, and acidity.
- Cook to the correct end‑point (use the “saucer test” or thermometer).
- Fill jars, seal, and label properly.
- Check quality and estimate shelf‑life.
- Troubleshoot problems (e.g., runny jam, crystallization).
- Marketing & Branding Activity:
- Design simple, attractive labels for your ketchup, pickle, and jam.
- Discuss where and how to sell locally (shops, markets, neighbors).
- Plan how to collect customer feedback and improve.
- Finalize Your Business Action Plan:
- Complete all sections:
- Product description and target market.
- Total investment and equipment list.
- Raw material suppliers.
- Step‑by‑step production plan.
- Final pricing, expected income, and profit projection.
- Implementation timeline (when to start each activity).
- Risks and how you will manage them.
- Immediate actions for the coming week.
- Complete all sections:
Module 4: Practical Production (Food Processing)
- Processing of scan-validated products.
- Numeric endpoints: using pH strips to verify acidity, checking Brix via thermometer.
- Shelf-life validation and risk troubleshooting.
Module 5: Branding, Sales & Compliance Jam Making:
- Producer group formation and collective procurement of jars/lids/labels. Shared processing units.
- Targeting the Swat hotel/visitor market; basic digital marketing (WhatsApp Business, Facebook).
- Regulatory & Licensing: KP Food Safety and Halal Food Authority registration, applicable PSQCA standards, and mandatory label content (weight, ingredients, expiry, producer identity).
- Access to finance (village savings, microfinance, existing subsidies).
PACKAGE 3
Context-Specific Climate-Smart Agriculture for Buner and Swat
Training duration: 3 days
Expected training events: 4
Expected training events: 4 ( 2 M, 2 F) Swat & Buner
Module 1: Local Climate Risks and Climate-Smart Crop Planning for Buner and Swat
- Local climate and weather patterns specific to the Buner and Swat valleys.
- Major climate hazards and trends (floods, drought, heatwaves, irregular rainfall) of Swat & Buner.
- Impacts of climate change on key local crops (maize, wheat, vegetables) and orchards (apples, peaches, persimmons).
- Vulnerability assessment of local farming systems and livelihoods.
- Climate-resilient crops and varieties suitable for the agro-ecological zones of Buner and Swat.
- Local cropping calendars (Kharif and Rabi seasons) and climate-informed adjustments.
- Crop diversification strategies for risk reduction in rainfed and irrigated areas.
- Farm-level climate-risk assessment (participatory mapping of vulnerable farm plots).
- Climate Risk vs. Market Opportunity Matrix: Selecting adaptation options that are both resilient and sellable.
- Varietal recommendations cross-checked against value chain analysis for market acceptance.
Module 2: Climate-Smart Soil and Water Management
- Soil health assessment and conservation techniques for hilly and valley terrains.
- Erosion control measures (contour ploughing, terracing, vegetative barriers).
- Water harvesting structures (ponds, check dams, roof catchment) suited to Buner/Swat rainfall patterns.
- Efficient irrigation systems (drip and sprinkler) for high-value orchards and vegetables.
- Moisture conservation practices (mulching, conservation tillage) for rainfed areas.
- Drought and water-scarcity management strategies specific to the district’s water sources (streams, springs, canals).
- Hands-on practical: Soil texture testing and moisture retention demonstration using local materials.
Module 3: Climate-Smart Horticulture and Orchard Management
- Climate-resilient horticultural practices for Buner and Swat (focus on apples, peaches, apricots, and walnuts).
- Orchard management under heat, drought, and flood stress.
- Tree health management and training/pruning techniques for improved fruit quality.
- Pest and disease management specific to local orchards (scab, codling moth, aphids).
- Canopy management for shade regulation and frost protection.
- Post-harvest loss reduction techniques (grading, packaging, and low-cost storage for fruits).
- Hands-on practical: Pruning demonstration and identification of local orchard pests/diseases.
- Costed comparison of orchard rehabilitation against replanting (including payback periods) addressing the primary decision facing local orchard households.
- Technology selection (drip kits, tunnel plastic, solar dryers) tied to a scan of local suppliers.
- Provide an annexed local supplier directory (supplier, price, after-sales service). Outline KP Agriculture Department subsidy pathways.
- Half-day module covering risks beyond the farm gate: road closures/floods, absent cold chains, and price collapse during synchronized harvests.
- Responses: staggered planting, collective transport, and aggregation. Target specific post-harvest loss points from the value chain analysis.
Module 4: Integrated Crop-Livestock Systems, Agroforestry and Ecosystem-Based Adaptation
- Climate risks to local livestock (cattle, goats, poultry) in Buner and Swat.
- Improved animal housing and ventilation for heat-stress management.
- Feed and fodder management (cultivation of local drought-resistant fodder species).
- Water availability and quality management for livestock.
- Crop-livestock integration (using crop residues for feed, manure for soil fertility).
- Ecosystem services and watershed conservation in the Swat River catchment.
- Agroforestry systems suitable for the landscape.
- Vegetative measures and biodiversity conservation.
- Nature-based Solutions (NbS) relevant to flood-prone and drought-affected microclimates of the region.
- Hands-on practical: Planning a small-scale integrated farm model for a typical Buner/Swat holding.
Module 5: Climate-Smart Technologies and Green Practices
- Efficient irrigation technologies (solar-powered drip systems for orchards).
- Solar energy applications (solar dryers for fruits, solar water pumps).
- Protected cultivation (low-cost polytunnels and greenhouses for off-season vegetables).
- Resource-efficient technologies (improved cookstoves, biogas from livestock waste).
- Renewable energy opportunities for off-grid rural households.
- Agricultural waste reduction and recycling (crop residue management, composting of fruit waste).
Module 6: Farmer Climate-Smart Action Plan (Village-Specific Development)
Participants will develop practical, location-specific action plans covering:
- Major climate risks identified on their own farm (flood, drought, pest outbreak).
- Priority adaptation measures selected from the training modules.
- Required resources (seeds, materials, water infrastructure) and sourcing.
- Seasonal implementation schedule aligned with the Buner/Swat cropping calendar.
- Estimated costs and expected benefits of proposed interventions.
- Responsibilities and follow-up plan (individual and group-level actions).
- Presentation and peer-review of draft action plans.
- Common Requirements for All Manuals
4.1 Bilingual and Farmer-Friendly Content
All manuals shall be developed in English and Urdu, with Urdu technically adapted for semi-literate users, independently reviewed and back-checked against English, with Pashto facilitation provided where required.
The consultant/firm shall ensure that the manuals:
- Use simple, clear and farmer-friendly language.
- Explain technical terminology in understandable terms.
- Use short sentences and practical examples.
- Include appropriate pictures, Colors.
- Present practical procedures through clear, step-by-step instructions.
- Include simple checklists, key messages and Do’s and Don’ts.
- Use locally relevant examples, particularly for Buner and Swat where applicable.
- Minimize lengthy theoretical text.
- Facilitator’s Manual
- Participant Handbook / Pictorial Job-Aid
- Session Plans & Presentation Materials.
The manuals shall follow a “Show – Explain – Demonstrate – Practice” learning approach.
Final manuals shall be submitted in editable MS Word, In page and print-ready PDF formats.
4.2 Training Methodology
Training shall use participatory adult-learning methods, including:
- Pre Test & Post Test
- Practical sessions shall maintain a maximum 1:15 trainer-to-participant ratio.
- Field-based learning.
- Group exercises.
- Local examples and case studies.
- Visual learning materials.
- Question and answer sessions.
- Knowledge and skills assessments.
- Business and/or farm action planning, where relevant.
Climate resilience, environmental sustainability, gender equality, social inclusion and safe working practices shall be appropriately integrated throughout the training content Male trainers/facilitators shall deliver sessions for male participants, while qualified female trainers/facilitators shall deliver sessions for female participants.
- Technical Resource Persons
As the assignment involves direct engagement with communities, women, youth and potentially participants with low levels of formal education, the consultant/firm shall apply appropriate safeguarding, do-no-harm principles and conflict of interest and submit a signed declaration for this assignment.
The consultant/firm and all proposed team members shall
- respect the dignity, rights, privacy and safety of participants
- The consultant shall obtain informed consent before collecting personal information, photographs, recordings, or other identifiable information, in accordance with the EPS/IRC Policy
- maintain confidentiality and use participant information only for legitimate assignment purposes
- apply child-protection measures and ensure that any engagement with children or adolescents is conducted safely and in accordance with applicable EPS/IRC safeguarding requirements
- use gender-sensitive, inclusive and culturally appropriate facilitation methods
- avoid discrimination, harassment, exploitation, abuse or any conduct that may cause harm.
- Where concerns, incidents or safeguarding risks arise during field activities, the consultant/firm shall promptly report them through the designated EPS reporting/coordination mechanism and follow applicable procedures.
The consultant/firm shall disclose and declare any actual, potential or perceived conflict of interest relating to the assignment, project staff, participants, suppliers or other stakeholders. Any conflict arising during implementation shall be disclosed immediately to EPS for appropriate management.
The consultant/firm shall submit the CV of the lead consultant and proposed technical resource persons with the proposal.
Where required, the consultant/firm shall engage qualified specialists in the relevant technical areas, including:
- Climate change and Climate-Smart Agriculture.
- Nursery, horticulture and orchard management.
- Organic farming and composting.
- Kitchen gardening.
- Food processing and preservation.
- Business development and enterprise planning.
- Urdu technical translation and editing.
The proposed technical team shall be relevant to the package(s) applied for. The consultant/firm shall remain responsible for the coordination, supervision and quality of all technical inputs and training delivery.
- Training Requirements
| Package | Training Manual | Duration | Expected Trainings |
| 1 | Climate Change, Green Skills, Nursery, Horticulture & Orchard Management | 03 days | 4 |
| 2 | Kitchen Gardening, Ketchup, Pickle and Jam Making, Business and Action Planning | 03 days | 4 |
| 3 | Context-Specific Climate-Smart Agriculture – Buner & Swat | 03 days | 4 |
| Total | 3 Manuals | 12 trainings |
EPS will provide participant numbers and locations and handle participant selection and mobilization, with the final schedule agreed with the consultant.
- Key Deliverables
Depending on the package(s) awarded, the consultant/firm shall provide:
- Inception note and workplan.
- Draft bilingual training manual(s).
- Technical review and validation of the manual(s) in to two review rounds.
- Final bilingual manual(s) in ready-to-use format.
- Day-wise and session-wise training plans.
- Training presentations and practical exercise materials.
- Pre/post-training and practical assessment tools, as appropriate with at least up to 50%.
- Delivery of the assigned training events.
- Attendance and participant assessment records.
- Detailed completion report for each training event.
Final editable MS Word and PDF manuals, with the pre-test report, participant database, consented photos, completed action plans, source design files, and clear printing responsibilities and quantities.
- Required Qualifications and Experience
The consultant/firm shall demonstrate:
- Master’s degree or equivalent in a relevant technical field.
- At least 10 years of relevant professional experience, preferably in the technical area of the package applied for.
- Demonstrated experience in developing training manuals, curricula or similar learning materials.
- Relevant practical experience in the subject area of the package applied for.
- Experience in delivering community-level training.
- Strong technical writing, facilitation and communication skills.
- Experience with NGOs, development organizations or donor-funded projects is an advantage.
- Experience developing bilingual English-Urdu materials for farmers or low-literacy communities is strongly preferred.
- For Package 3, demonstrated knowledge of the agricultural and climate context of Buner and Swat will be an advantage.
- Assignment Period
The consultancy period will be agreed according to the package(s) awarded and shall cover:
- Manual research and development.
- Translation and technical editing.
- Review and finalization.
- Training preparation.
- Training delivery.
- Training documentation and final reporting.
- Detailed proposed timeline (in days):
The consultant/firm shall follow the following indicative timeline, to be finalized and agreed with EPS at commencement. Strict compliance with the agreed timeline shall be mandatory.
- Inception meeting, assignment understanding & detailed work plan in 1-3 working days.
- Literature/document review, consultation and manual/curriculum development in 7 days.
- Submission of 1st draft bilingual manual/curriculum: 1 day.
- Technical review, comments and validation by EPS/IRC: 2-3 days.
- Incorporation of review comments and finalization of manual/curriculum: 3 days.
- Training preparation, session plans, presentations, practical exercises and assessment tools: 3 days.
- Training delivery period: EPS mentioned dates during the months October to December 2026.
- Submission of Completion Report for each training: Within 2 days after completion of each training event.
- Final/consolidated assignment report: Within 5 days after completion of all assignments.
- Any change in the approved timeline shall require prior written approval from EPS.
- Proposal Submission Requirements
Indicative Level of Effort
Applicants shall propose an appropriate level of effort in person-days for each package applied for, based on the scope, technical requirements, manual development, review/finalization, training preparation, training delivery and reporting requirements.
For planning purposes only, the following indicative ranges may be used: Package 1: 3–4 person-days, Package 2: 3–4 person-days, Package 3: 4–5 person-days. These ranges are indicative and non-binding. Consultants/ firms may propose a different level of effort were justified by their methodology, team composition and proposed workplan.
Where multiple packages are proposed, the applicant shall provide a package-wise and consolidated person-day allocation and clearly identify the contribution of each proposed team member.
Applicants shall clearly state the package(s) for which they are applying.
Technical Proposal
The proposal shall include:
- Understanding of the relevant assignment/package(s).
- Proposed methodology and approach.
- Detailed workplan.
- Relevant individual/organizational experience.
- Proposed technical team.
- CVs of the lead consultant and technical resource persons.
- Samples of relevant training manuals/materials, where available.
- Approach for developing simple bilingual English-Urdu materials.
- For Package 3, approach for developing Buner and Swat specific CSA content.
- For Package 3, develop Swat- and Buner-specific CSA content based on market and value-chain findings, supported by a Curriculum–Market Alignment Matrix.
Financial Proposal
A separate financial proposal shall be submitted for each package applied for, clearly identifying:
- Manual development and translation.
- Professional consultancy fees.
- Technical resource persons fees.
- Training delivery costs.
- Practical demonstration/material costs, where applicable.
- A cost-responsibility matrix shall clearly define the costs covered by EPS/IRC and the consultant.
- Other applicable costs.
Package-wise financial proposals will enable EPS/IRC to evaluate and award packages independently.
- Evaluation Criteria
Each package shall be evaluated separately using the following indicative technical criteria:
Each package shall be evaluated separately using fixed technical criteria and a clear scoring rubric with defined sub-criteria, published before advertisement.
| Evaluation Criterion | Weight |
| Academic qualifications | 5% |
| Relevant professional/technical experience | 15% |
| Experience in training manual/curriculum development | 15% |
| Understanding and proposed methodology & reasonable timeline | 15% |
| Qualifications and experience of proposed technical team | 10% |
| Experience in bilingual/low-literacy training materials | 5% |
| Relevant local/contextual experience | 15% |
| Gender-responsive and inclusive facilitation | 10% |
| Interview / presentation | 10% |
| Total | 100% |
For Package 3, particular consideration will be given to experience in Buner and Swat, local agricultural systems, climate risks and context-specific CSA practices.
Only proposals meeting the minimum technical threshold (70%) shall proceed to financial evaluation.
Only proposals meeting the 70% technical threshold shall proceed to financial evaluation. The final score shall comprise 70% technical and 30% financial, with the contract awarded to the highest combined score, subject to satisfactory due diligence and reference checks.
Shortlisted applicants may be invited to an interview and/or technical presentation to assess practical understanding of the assignment, proposed methodology, facilitation approach, communication skills and readiness to deliver the required outputs. The interview/presentation score shall be considered as part of the technical evaluation.
- Award and Contracting Arrangement
EPS may award one or more packages to the same consultant/firm or award different packages to different consultants/firms.
Award decisions shall consider:
- Technical competence and relevant experience.
- Quality and suitability of the proposed technical team.
- Understanding of the assignment.
- Proposed methodology and workplan.
- Financial competitiveness.
- Availability to meet the required schedule.
Technical qualification for one package shall not automatically qualify an applicant for another package; each package shall be assessed on its own requirements.
- Ownership and Use of Materials
All manuals, training materials, presentations, exercises, tools and other outputs developed under this assignment shall remain the property of EPS/IRC under the project, subject to applicable contractual and donor requirements.
The consultant assigns all rights, title, and interest in the manuals and materials to EPS/IRC. The consultant warrants the originality of all content and ensures all images/illustrations are original or licensed for unrestricted use. IUCN Global EbA Fund, EPS, and IRC visibility and disclaimer guidelines must be strictly applied. Materials may not be published or reused by the consultant without prior written consent and may be subject to an open license (e.g., CC BY-NC) per donor requirements.
- Other conditions
All travel and other costs (including applicable taxes) related to this assignment will be inclusive of the total proposed cost of consultancy. EPS will not be responsible for any other payables or arrangements therein regarding this assignment.
The consultant shall comply with EPS/IRC security protocols and obtain required permissions while force mature provisions shall cover security incidents, flooding, and road closures.
- Payment Schedule
Payment for the assignment after deduction of applicable taxes will be made as per below schedule;
| S# | Task | % amount to disburse |
| 1 | Submission of inception report & Curriculum-Market Matrix | 10% |
| 2 | Acceptance of Finalized Manuals (post field-test) | 30% |
| 3 | Completion of trainings and reports submission | 50% |
| 4 | Acceptance of Final Consolidated Assignment Report | 10% |
| 5 | Note: Any delay will result in a penalty of 1-2% deduction from the consultant fee per week of delay. | |
Penalty Clause:
A deduction of 1% of the total contract value shall apply for each completed week of delay, to a cumulative maximum of 10%. No deduction shall apply where the delay is attributable to EPS/IRC (including delays in review turnarounds or participant mobilization), or where it arises from force majeure, security restrictions, or natural hazards. Deductions shall be applied only after written notice and an opportunity to respond within five working days.
Please submit your proposals, duly signed by the consultant/firm, in separate sealed envelopes i.e. one for financial proposal and one for the technical proposal to the following address. Electronic submissions are also allowed at the email ID mentioned below.
Mr. Khalilullah – HR Manager
Environmental Protection Society (EPS)
Darbar Saidu Sharif, Swat, Khyber Pakhtunkhwa.
Phone: 0946-9240254 / 0946-711162 Fax: 0946-721062
E-mail: info@eps-swat.org, Web: www.eps-swat.org
The last date for submission of the proposal is Ten days after the advertisement